Recent-Projects-List ...

Our Recent-Projects Include New Construction As-Well-As Addition and Renovation of Residential, Commercial, Condo, Light-Industrial, Multi-Family Buildings, ...


Here we feature a variety of our recent projects ... so visit with us often for the latest updates.

We will cover new construction, additions, and renovation projects. We work on residential, commercial, educational, light industrial, and a whole variety of interesting projects.

Building with energy efficiency in mind makes sense not only economically -- it is our moral and ethical responsibility, and it is for the health and welfare of our families and our future generations.

Energy efficiency can not be an after thought -- it must be a systems approach. The layout and planning, the structure ... the foundation, the walls, the floors, the roof, doors-and-windows, and HVAC, electrical, equipment and furnishings, all have an impact on the energy consumption of the building. It takes a team of competent professionals to build an energy efficient building.

We treat every project as unique, and every new project, like a new born child, deserves our tender loving care and full attention.

We will describe what is happening as it happens updating you with the latest descriptions and pictures.


I believe it makes sense that in recent-projects we cover our current and most recent projects. So, in more-recent-projects ... we cover the other earlier (not so recent) projects.

-----------------------

See

recent-projects-list for list of our energy efficient building projects

recent-projects for our current and most recent projects

more-recent-projects for our earlier (not the most recent) projects

-----------------------

Concrete-Strength-Basement-Wall-Pour-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101.html

Placing-Concrete-in-ICF-Basement-Walls-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101

Installing-ICF-Blocks-Basement-Walls-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101

Footings-for-the-new-ICF-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101

Starting-Costruction-of-a-new-ICF-Building-in-Ann-Arbor-Michigan-Project-EneE1DomM1-101

Second-Floor-Balcony-Steel-Structure-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Second-Floor-Steel-And-Open-Web-Joists-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Second-Floor-Walls-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Laundry-Room-And-Garage-Foundation-Walls-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Wood-Decking-First-Floor-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Purlins-Over-Open-Web-Steel-Joists-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Open-Web-Steel-Joists-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Structural-Steel-Framing-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Basement-Walls-New-ICF-House-In-Ann-Arbor-Michigan-EneE1-AttM1-101

Replacing-Wall-Panels-Suffering-Water-Damage-From-Overgrown-Trees-Too-Close-To-The-House-ParR1-103

Fix-For-Water-Leak-In-Basement-Leads-To-Repair-Of-FirePlace-Cap-And-Flashing-ParR1-102

Fix-For-Broken-Bricks-And-Crack-in-South-Wall-Of-A-House-In-Southeastern-Michigan-Project-ParR1

Angelicas-Place-Assisted-Living_Mar-31-2009-Update-Project-KalA1-101

Rehabilitating-A-Foreclosed-House-In-Dearborn-Michigan-Part2-Project-OseH1-104

Rehabilitating-A-Foreclosed-House-In-Dearborn-Michigan-Part1-Project-OseH1-104

Rehabilitating-An-Existing-House-In-Wayne-Michigan-Part2-Project-MarB1-101

Rehabilitating-An-Existing-House-In-Wayne-Michigan-Part1-Project-MarB1-101

Industrial-Building-Addition-Project_As-Built-For-Process-Pits-In-The-Floor-ColB1-103

Industrial-Building-Addition_Project-Status-As-Of-2009-03-11-ColB1-103

Expert-Witness-Testimony-For-Evaluating-An-As-Built-Foundation-For-A-House-Project-RPG_1-101

MindMap-For-Evaluating-An-As-Built-Foundation-For-A-House-Project-RPG_1-101

Evaluating-An-As-Built-Foundation-For-A-House-Project-RPG_1-101

Rehabilitating-A-Foreclosed-House-In-Dearborn-Michigan-Project-OseH1-104

Rehabilitating-An-Existing-House-In-Wayne-Michigan-Project-MarB1-101

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-17-RosO1-101

Installing-HVAC-Units-On-Roof-Of-An-Existing-Building-Part3-As-Built-Drawing-PonV1-101

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-14-RosO1-101

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-14-RosO1-101 Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-13-RosO1-101

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-12-RosO1-101

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-11-RosO1-101

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-10-RosO1-101

Industrial-Building-Addition_Project-Status-As-Of-2008-11-04-ColB1-103

Rosie-O-Gradys_Building-Addition-Project-Status-As-Of-2008-11-04-RosO1-101

Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part5-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part7-RosO1-101

Rosie-O-Gradys_Land-Scaping-In-Front-Of-Building-Addition-RosO1-101

Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-Part4-RosO1-101

Industrial-Building-Addition_Loading-Dock-Work-ColB1-103

Industrial-Building-Addition_Insulated-Siding-Part2-ColB1-103

Industrial-Building-Addition_Site-Civil-Work-Concrete-Paving-ColB1-103

Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-Part3-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part6-RosO1-101

Industrial-Building-Addition_Insulated-Siding-ColB1-103

Industrial-Building-Addition_Concrete-Floor-ColB1-103

Industrial-Building-Addition_Site-Civil-Work-Part6-ColB1-103

Industrial-Building-Addition-2-Ft-Deep-Pit-In-The-Floor-ColB1-103

Industrial-Building-Addition-10-Ft-Deep-Pit-In-The-Floor-Part3-ColB1-103

Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-Part2-RosO1-101

Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part4-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part5-RosO1-101

Rosie-O-Gradys_Synthetic-Stucco-Work-On-Exterior-Face-Of-Building-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part4-RosO1-101

Industrial-Building-Addition-10-Ft-Deep-Pit-In-The-Floor-Part2-ColB1-103

Industrial-Building-Addition_Loading-Dock-Concrete-Slab-ColB1-103

Industrial-Building-Addition_Block-Masonry-Work-Part4-ColB1-103

Industrial-Building-Addition_Site-Civil-Work-Part5-ColB1-103

Industrial-Building-Addition_Pouring-Rat-Wall-Along-With-Part-Of-The-Floor-Part2-ColB1-103

Industrial-Building-Addition-10-Ft-Deep-Pit-In-The-Floor-ColB1-103

Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part3-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part3-RosO1-101

Industrial-Building-Addition_Block-Masonry-Work-Part3-ColB1-103

Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part5-ColB1-103

Industrial-Building-Addition_Pouring-Rat-Wall-Along-With-Part-Of-The-Floor-ColB1-103

Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-Part2-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-Part2-RosO1-101

Industrial-Building-Addition_Block-Masonry-Work-Part2-ColB1-103

Industrial-Building-Addition_Site-Civil-Work-Part4-ColB1-103

Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part4-ColB1-103

Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part5-RosO1-101

Rosie-O-Gradys_Building-Addition-Interior-Finish-Work-RosO1-101

Rosie-O-Gradys_Work-Inside-The-Existing-Building-Without-Shutting-The-Facility-Down-RosO1-101

Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part4-RosO1-101

Rosie-O-Gradys_Building-Addition-Drywall-Installation-Part2-RosO1-101

Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part3-ColB1-103

Industrial-Building-Addition_Site-Civil-Work-Part3-ColB1-103

Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part3-RosO1-101

Rosie-O-Gradys_Building-Addition-Drywall-Installation-RosO1-101

Installing-HVAC-Units-On-Roof-Of-An-Existing-Building-With-Pitched-Roof-Part2-PonV1-101

Installing-HVAC-Units-On-Roof-Of-An-Existing-Building-With-Pitched-Roof-PonV1-101

Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-Part2-RosO1-101

Industrial-Building-Addition_Installation-Of-Roof-Panels-And-Soffit-Insulation-Part2-ColB1-103

Industrial-Building-Addition_Site-Civil-Work-Part2-ColB1-103

Rosie-O-Gradys_Building-Addition-Face-Brick-And-Stone-Veneer-Installation-RosO1-101

Industrial-Building-Addition_Insatallation-Of-Roof-Panels-And-Soffit-Insulation-ColB1-103

Rosie-O-Gradys_Building-Addition-Rubber-Roof-Installation-RosO1-101

Rosie-O-Gradys_Building-Addition-Rough-Framing-Inspection-RosO1-101

Rosie-O-Gradys_Building-Addition-Sprinkler-Heads-And-Piping-Installation-RosO1-101

Rosie-O-Gradys_Building-Addition-Electrical-Wiring-Installation-RosO1-101

Rosie-O-Gradys_Building-Addition-Progress-Report-20080912-RosO1-101

Industrial-Building-Addition_Site-Civil-Work-ColB1-103

Industrial-Building-Addition_Block-Masonry-Work-ColB1-103

Fixing-Leak-In-Basement-Existing-House-In-Southeastern-Michigan-Part3

Fixing-Broken-Face-Bricks-In-Existing-House-Part2-In-Southeastern-Michigan

Fixing-Leak-In-Basement-Existing-House-In-Southeastern-Michigan-Part2

Fixing-Broken-Face-Bricks-In-Existing-House-In-Southeastern-Michigan

Fixing-Leak-In-Basement-Existing-House-In-Southeastern-Michigan

Rosie-O-Gradys_Building-Addition-Face-Brick-Installation-Part2-RosO1-101

Industrial-Building-Addition_Erection-Of-Premanufactured-Building-Frames-Part3-ColB1-103

Existing-Facility_Structural-Modifications-For-Converting-Into-A-Loft-And-An-Art-Studio-MAP-104

Existing-House_Concrete-Deck-And-Patio-Addition-Part2-OseH1-103

Existing-House_Concrete-Deck-And-Patio-Addition-OseH1-103

Existing-House_Fix-To-Restore-Structural-Integrity-Of-Cut-Framing-Part2-OseH1-102

Existing-House_Fix-To-Restore-Structural-Integrity-Of-Cut-Framing-OseH1-102

Rosie-O-Gradys_Building-Inspection-And-Building-Interior-Work-RosO1-101

Rosie-O-Gradys_Building-Addition-Face-Brick-Installation-RosO1-101

Industrial-Building-Addition_Erection-Of-Premanufactured-Building-Frames-Part2-ColB1-103

Industrial-Building-Addition_Erection-Of-Premanufactured-Building-Frames-ColB1-103

Industrial-Building-Addition_Loading-Dock-Concrete-Walls-ColB1-103

Rosie-O-Gradys_Prep-Work-For-Installation-Of-Roof-Top-Units-RosO1-101

Rosie-O-Gradys_Installation-Of-Window-Frames-In-ICF-Walls-RosO1-101

Angelicas-Place-Assisted-Living_Aug-02-2008-Update-Project-KalA1-101

Industrial-Building-Addition_Loading-Dock-West-Side-Concrete-Wall-ColB1-103

Rosie-O-Gradys_Roof-And-Exterior-Wall-Finish-Prep-Work-Part3-RosO1-101

Rosie-O-Gradys_Plumbing-Work-For-First-Floor-RosO1-101

Industrial-Building-Addition_Forming-And-Concreting-Column-Footing-Piers-Part2-Project-ColB1-103

Rosie-O-Gradys_Roof-And-Exterior-Wall-Finish-Prep-Work-Part2-RosO1-101

Rosie-O-Gradys_Roof-And-Exterior-Wall-Finish-Prep-Work-RosO1-101

Rosie-O-Gradys_Artist-Rendering-Versus-Building-Addition-Taking-Shape-RosO1-101

Rosie-O-Gradys_Protecting-Second-Floor-Concrete-Surface-From-Damage-RosO1-101

Rosie-O-Gradys_Window-Bucks-In-Place-Getting-Ready-For-Installing-Windows-RosO1-101

Rosie-O-Gradys_Installation-Of-Roof-Deck-And-Roof-Facia-Metal-Frame-RosO1-101

Industrial-Building-Addition_Forming-And-Concreting-Column-Footing-Piers-Project-ColB1-103

Rosie-O-Gradys_Installation-Of-Roof-Facia-Backup-EPS-Board-RosO1-101

Rosie-O-Gradys_Completing-Installation-Of-Second-Floor-Load-Bearing-Walls-And-Roof-Joists-RosO1-101

Rosie-O-Gradys_Second-Floor-Concrete-Score-Lines-As-Part-Of-Decorative-Finish-RosO1-101

Industrial-Building-Addition_Concrete-Placement-In-Column-Footings-Part2-Project-ColB1-103

Rosie-O-Gradys_Second-Floor-Concrete-Pour-Project-RosO1-101

Rosie-O-Gradys_Shoring-For-Second-Floor-Concrete-Pour-Project-RosO1-101

Rosie-O-Gradys_Jul-14-2008-Update-Project-RosO1-101

Rosie-O-Gradys_Jul-11-2008-Update-Project-RosO1-101

Rosie-O-Gradys_Jul-10-2008-Update-Project-RosO1-101

Mezzanine-Floor-Addition-In-Auto-Repair-Shop-Project-SimH1-104

Rosie-O-Gradys_Jul-09-2008-Update-Project-RosO1-101

Rosie-O-Gradys_Jul-08-2008-Update-Project-RosO1-101

Rosie-O-Gradys_Jul-03-2008-Update-Project-RosO1-101

Industrial-Building-Addition_Concrete-Placement-In-Column-Footings-Project-ColB1-103

Rosie-O-Gradys_Jul-02-2008-Update-Project-RosO1-101

Industrial-Building-Addition_Readiness-For-Pouring-Column-Footings-Project-ColB1-103

Industrial-Building-Addition_Digging-For-Column-Footings-Project-ColB1-103

Rosie-O-Gradys_Jun-30-2008-Update-Project-RosO1-101

Rosie-O-Gradys_Jun-27-2008-Update-Project-RosO1-101

Remodeling-Whole-House-In-Southeastern-Michigan-Part2-Project-NapR1-101

Remodeling-Whole-House-In-Southeastern-Michigan-Project-NapR1-101

Rosie-O-Gradys_Getting-Ready-To-Install-Second-Floor-Metal-Deck-Project-RosO1-101

Rosie-O-Gradys_Refreshing-Soil-Erosion-Control-Measures-Project-RosO1-101

Rosie-O-Gradys_Second-Floor-Joists-Installation-Part3-Project-RosO1-101

Rosie-O-Gradys_Second-Floor-Joists-Installation-Part2-Project-RosO1-101

Rosie-O-Gradys_Second-Floor-Joists-Installation-Project-RosO1-101

Aircraft-Hangar-Building-Foundation-for-Coletta-Builders-Project-ColB1yae-104

Angelicas-Place-Assisted-Living_Getting-Ready-For-Site-Paving

Angelicas-Place-Assisted-Living_Jun-19-2008-Update

Facia-Upgrade-Front-Porch-Existing-House-In-Southeastern-Michigan

Deteriorated-Front-Porch-Facia-Existing-House-In-Southeastern-Michigan

Rosie-O-Gradys_Structural-Steel-Installation-Project-RosO1-101

Rosie-O-Gradys_Concrete-Placement-In-Header-Below-Second-Floor-Project-RosO1-101

Rosie-O-Gradys_Granular-Backfill-Upto-BrickLedge-Level-Project-RosO1-101

Rosie-O-Gradys_Installing-Anchor-Plates-For-Rim-Joist-For-Supporting-Second-Floor-Project-RosO1-101

Rosie-O-Gradys_Concrete-Placed-From-Window-Sill-To-Header-Below-Second-Floor-Project-RosO1-101

Rosie-O-Gradys_Installing-ICF-Wall-Forms-Above-Window-Sill-Level-Project-RosO1-101

Angelicas-Place-Assisted-Living_Jun-07-2008-Update

Steel-Studs-And-Joists_A-Look-Inside-The-Plant

Rosie-O-Gradys_Concrete-Placement-In-ICF-Walls-To-Window-Sill-Level-Project-RosO1-101

Rosie-O-Gradys-Building-Addition_Installing-ICF-Walls-To-Window-Sill-Level-Project-RosO1-101

New-House-With-ICF-Basement-Walls-Backfilll-Issues-Project-AgoT1-101

New-House-With-ICF-Basement-Walls-Structural-Design-Project-AgoT1-101

ICF-House-New-Construction-Dormer-Window-Addition-Project-EneE1OmaE1-101

ICF-House-New-Construction-Framing-Issues-Part3-Project-EneE1OmaE1-101

ICF-House-New-Construction-Framing-Issues-Part2-Project-EneE1OmaE1-101

ICF-House-New-Construction-Framing-Issues-Project-EneE1OmaE1-101

Rebuild-Fire-Damaged-House-In-Washington-Township-Michigan-Part2

Angelicas-Place-Assisted-Living_Elevator-Shaft-Work-and-Interior-and-Exterior-Finish

Rebuild-Fire-Damaged-House-In-Washington-Township-Michigan

Rehabilitating-Existing-Idle-Industrial-Building_To-A-Storage-Facility-Part3

Rehabilitating-Existing-Idle-Industrial-Building_To-A-Storage-Facility-Part2

Rehabilitating-Existing-Idle-Industrial-Building_To-A-Storage-Facility-Part1

Looking-at-a-Basement-Wall-Failure-During-Backfill-Operation-Part3

Looking-at-a-Basement-Wall-Failure-During-Backfill-Operation-Part2

Looking-at-a-Basement-Wall-Failure-During-Backfill-Operation-Part1

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Exterior-Siding

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Building-Components-3

Rosie-O-Gradys-In-Chesterfield-Twp-Michigan_Concrete-In-Footings-For-Building-Addition

Rosie-O-Gradys-In-Chesterfield-Twp-Michigan_Footings-For-Building-Addition

Rosie-O-Gradys-In-Chesterfield-Twp-Michigan_Site-Civil-Work-For-Building-Addition

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Building-Components-2

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Installation-of-Building-Components

Rosie-O-Gradys-Restaurant-&-Pub-on-23-Mile-Road-in-Chesterfield-Twp-Michigan

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Roof-Joists-And-Trusses

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Stud-Walls-And-Steel-Stair-Stringers

US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-06-07-Update
(posted on Jan-20-2008 -- makes up for missing link in Jun-2007)

Relieving-An-Existing-ICF-Wall-Header-And-Supporting-Posts-Of-Imposed-Roof-Loading

Reinforcing-An-Existing-Wall-Header-And-Supporting-Posts

Loading-Residential-Structure-MAP_1-103

Evaluating-Condition-Of-Structural-Steel-In-A-Commercial-Building-Of-1960s-Vintage_KouR1-101b

Prefabricated-Concrete-Fiber-Panels-In-The-Roof-Of-A-Commercial-Building_KouR1-101a

Looking-At-The-Wooded-Lake-Front-Lot-AS-Potential-Home-Site--BenK1-101

Foundation-Structural-Arrangement-And-Member-Design-MAP_1-103

First-Floor-Structural-Arrangement-And-Member-Design-MAP_1-103

Second-Floor-Structural-Arrangement-And-Member-Design-MAP_1-103

Roof-Structural-Arrangement-And-Member-Design-MAP_1-103

Custom-Truss-Design-With-The-Bottom-Chord-Raised-In-The-Middle

Header-For-ICF-Wall-With-Light-Framed-Second-Story-And-Roof-Above

ICF-4-Inch-Panel-Wall-And-Footing-To-Existing-8-Inch-Panel-Wall

New-8-Inch-Panel-Wall-And-Footing-To-Existing-8-Inch-Panel-Wall

Buildblock-8-Ich-Panel-Wall-To-Be-Fastened-To-8-Inch-Panel-Buildblock-Wall-Already-In-Place

Joining-New-4-inch-ICF-Panel-Wall-To-8-inch-ICF-Panel-Wall-In-Place

Structural-Integrity-Evaluation-Trusses-Cut-In-Existing-House-To-Raise-Height-Of-Room-At-One-End

Frost-Protected-Shallow-Foundation-For-An-ICF-Building-Wall-In-Southeastern-Michigan

Cutting-Door-Opening-in-An-Existing-ICF-Wall

Gander-Mountain-Store-Summit-Mall-Waterford-Michigan-Door-Addition-Project-3

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Stud-Walls-Above-Second-Floor

Gander-Mountain-Store-Summit-Mall-Waterford-Michigan-Door-Addition-Project-2

Gander-Mountain-Store-Summit-Mall-Waterford-Michigan-Door-Addition-Project

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Second-Floor-Concrete-Placement

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Readiness-for-Second-Floor-Concrete-Placement

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_concrete-placement-in-wraparound-porch

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_readiness-for-concrete-placement-in-porch-slab

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Light-Gage-Steel-Joists-For-Second-Floor-Deck

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_GlasRoc-Sheathing-For-Exterior-Stud-Walls

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Steel-Stud-Walls-Above-First-Floor

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Footing-for-Wraparound-Porch

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_First-Floor-on-Metal-Deck-Concrete-Placement

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Readiness-for-First-Floor-Concrete-Placement

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Shoring-For-First-Floor-Concrete-Placement

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Metal-Studs-in-Basement

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Open-Web-Steel-Joists-for-First-Floor

Existing-Pole-Barn-in-Rochester-Hills-Michigan-to-be-Relocated-in-Ira-Twp-Michigan-3

Existing-Pole-Barn-in-Rochester-Hills-Michigan-to-be-Relocated-in-Ira-Twp-Michigan-2

Existing-Pole-Barn-in-Rochester-Hills-Michigan-to-be-Relocated-in-Ira-Twp-Michigan

Energy-Efficient-ICF-Walls-For-House-With-Insul-Deck-Floor

Energy-Efficient-House-Shoring-Installation-For-First-Floor-Insul-Deck-Panels

Energy-Efficient-House-First-Floor-Insul-Deck-Panels-Installation

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Basement-Slab-Concrete-Placement

House-Modification_Retrofitting-Existing-House-With-An-Egress-Window-2

House-Modification_Retrofitting-Existing-House-With-An-Egress-Window

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Basement-ICF-Walls-Concrete-Placement

Modifying-Existing-Trusses-to-Carve-Out-a-Room-in-the-Garage-Attic-3

Modifying-Existing-Trusses-to-Carve-Out-a-Room-in-the-Garage-Attic-2

Modifying-Existing-Trusses-to-Carve-Out-a-Room-in-the-Garage-Attic

Avon-North-Hill-Lanes-in-Rochester-Hills-Michigan_LCD-Plasma-Screen-Monitor-Addition

Angelicas-Place-Assisted-Living-in-Romeo-Michigan_Footing-Concrete-Placement

Latest project Update added in Jun 2007

Condo-Renovation_Structural-Integrity-Evaluation-Of-Cut-Trusses-2

Condo-Renovation_Structural-Integrity-Evaluation-Of-Cut-Trusses

Guniting-20ftx40ft-Pool-With-10ftx8ft-Spa-Both-Art-And-Science

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Footings-For-Stairs-To-First-Floor-Deck-3

Guniting-20ftx40ft-Pool-With-10ftx8ft-Spa-2

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Footings-For-Stairs-To-First-Floor-Deck-2

Guniting-20ftx40ft-Pool-With-10ftx8ft-Spa

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Reinforcing-Steel-Installation-Prior-To-Guniting-2

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Plumbing-2

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Finish-Brick-Work-At-Building-To-Match-Existing

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Plumbing

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Reinforcing-Steel-Installation-Prior-To-Guniting

US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-14-07-Grand-Opening

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Footings-For-Stairs-To-First-Floor-Deck

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Excavation-2

Gunited-Pool-20ftx40ft-With-10ftx8ft-Spa-Addition-Excavation

Structural-Integrity-Review-of-Apartments-Subsequent-To-Fire-In-Complex

US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-07-07-Update

Front-Entrance-With-Handicap-Ramp-5_US12-Bar-Building-in-Wayne-Michigan
posted on Jun-06-2007

Setting-Up-Business-Facility-On-Existing-Property-3-In-Romulus-Michigan
posted on Jun-05-2007

Setting-Up-Business-Facility-On-Existing-Property-2-In-Romulus-Michigan
posted on Jun-04-2007

Renovation-of-Commercial-Building-2-in-Wayne-Michigan
posted on Jun-03-2007

Sign-Installation-Pole-Mounted_Amani-Restaurant-in-Dearborn-Michigan
posted on Jun-02-2007

US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan-Jun-01-07-Update
posted on Jun-01-2007

Latest project Update added in May 2007

Sign-Installation-on-Facade-of-Amani-Restaurant-2-in-Dearborn-Michigan
posted on May-31-2007

Sign-Installation-on-Facade-of-Amani-Restaurant-in-Dearborn-Michigan
posted on May-30-2007

Aircraft-Hangar-Building-Foundation-for-Coletta-Builders
posted on May-29-2007

Sign-Installation-on-Facade-of-A-School-Building-3-in-Dearborn-Michigan
posted on May-27-2007

Sign-Installation-on-Facade-of-A-School-Building-2-in-Dearborn-Michigan
posted on May-26-2007

Front-Entrance-With-Handicap-Ramp-4_US12-Bar-Building-in-Wayne-Michigan
posted on May-24-2007

Sign-Installation-on-Facade-of-A-School-Building-in-Dearborn-Michigan
posted on May-21-2007

aircraft-hanger-building-01-cost-breakdown
posted on May-20-2007

Rehabilitation-Of-An-Existing-Commercial-Building-5-As-
A-MotorCyle-Accessories-Store

posted on May-19-2007

US12-Bar-On-Michigan-Ave-Addition-Modification-to-Building-in-Wayne-Michigan
posted on May-18-2007

Rehabilitation-Of-An-Existing-Commercial-Building-4-As-
A-MotorCyle-Accessories-Store

posted on May-17-2007

Rehabilitation-Of-An-Existing-Commercial-Building-3-As-A-MotorCyle-
Accessories-Store

posted on May-16-2007

Front-Entrance-With-Handicap-Ramp-3_Building-in-Wayne-Michigan
posted on May-15-2007

Rehabilitation-Of-An-Existing-Commercial-Building-2-As-A-MotorCyle-Accessories-Store.
posted on May-14-2007

Rehabilitation-Of-An-Existing-Commercial-Building-As-A-MotorCyle-Accessories-Store.
posted on May-13-2007

Front-Entrance-With-Handicap-Ramp-2_Building-in-Wayne-Michigan
posted on May-10-2007

Converting-Existing-Industrial-Building-For-Indoor-GoKart-Racing
posted on May-09-2007

Light-Gage-Metal-Framing-for-Select-Appurtenances-3_A-Look-At-The-Finished-Product-The-Ring
posted on May-08-2007

Front-Entrance-With-Handicap-Ramp_Building-in-Wayne-Michigan
posted on May-06-2007

Latest project Update added in Apr 2007

Structural-Modification-to-Existing-Industrial-Building-2
posted on Apr-25-2007 Update

Structural-Modification-to-Existing-Industrial-Building
posted on Apr-23-2007 Update

Rehabilitation of Apartment Building for Aero Realty-2 in Wayne Michigan
Apr-05-2007 Update

Setting-Up-Business-Facility-On-Existing-Property-In-Romulus-Michigan
Apr-04-2007 Update

ICF-Wall-Setback-On-The-Second-Floor-As-Deep-Beam-With-No-Support-Below
Apr-03-2007 Update

Framing-for-Suspended-Fan-Ceiling-3_Building-in-Wayne-Michigan
Apr-02-2007 Update

Rehabilitation-of-Commercial-Building-Good-News-Got-The-Building-Off-The-Dangerous-Building-List
Apr-01-2007 Update

Latest project Update added in Mar 2007

Light-Gage-Metal-Stud-Walls-Structural-Design-Calcs_Building-in-Rochester-Michigan
Mar-31-2007 Update

FollowUp-On-A-Heart-Warming-Story-About-Forberger-New-Lake-Front-ICF-House-In-Commerce-Twp-Michigan
Mar-26-2007 Update

A-Heart-Warming-Story-About-Forberger-New-Lake-Front-ICF-House-In-Commerce-Twp-Michigan
Mar-22-2007 Update

Framing-for-Suspended-Fan-Ceiling-2_Building-in-Wayne-Michigan
Mar-11-2007 Update

Forberger-New-Lake-Front-ICF-House-2-in-Commerce-Twp-Michigan
Mar-10-2007 Update

Framing-for-Suspended-Fan-Ceiling_Building-in-Wayne-Michigan
Mar-09-2007 Update

Forberger-New-Lake-Front-ICF-House-in-Commerce-Twp-Michigan
Mar-07-2007 Update

Rehabilitation of Apartment Building for Aero Realty in Wayne Michigan
Mar-02-2007 Update

Light-Gage-Metal-Framing-for-Select-Appurtenances-2_Building-in-Rochester-Michigan
Mar-01-2007 Update


Latest project Update added in Feb 2007

Enhancement-of-Storage-Warehouse-2-in-Wayne-Michigan
Feb-28-2007 Update

Light-Gage-Metal-Framing-for-Select-Appurtenances_Building-in-Rochester-Michigan
Feb-27-2007 Update

Enhancement-of-Storage-Warehouse-in-Wayne-Michigan
Feb-26-2007 Update

New-Roof-for-Part-of-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Feb-23-2007 Update

New-Face-Brick-4-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Feb-22-2007 Update

Electrical-2 for Stehr House in Highland Twp Michigan
Feb-18-2007 Update

Compaction-of-Soil-and-Use-of-Vapor-Barrier_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
Feb-17-2007 Update

HVAC-Installation-Work_for-Stehr-House-in-Highland-Twp-Michigan
Feb-16-2007 Update

Rehabilitation-of-commercial-building-3-in-Wayne-Michigan
Feb-12-2007 Update

New-Face-Brick-3-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Feb-10-2007 Update

New-ICF-House-in-Northfield-Twp-Michigan
Feb-09-2007 Update

Rehabilitation-of-commercial-building-2-in-Wayne-Michigan
Feb-08-2007 Update

New-Face-Brick-2-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Feb-07-2007 Update

Pool-Addition-3_in-Bloomfield-Twp-Michigan
Feb-06-2007 Update

After-Shell-Completion-Work_for-Stehr-House-in-Highland-Twp-Michigan
Feb-05-2007 Update

Interior-Work-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Feb-03-2007 Update

Pool-Addition-2_in-Bloomfield-Twp-Michigan
Feb-02-2007 Update

Latest project Update added in Jan 2007

New-Face-Brick-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Jan-31-2007 Update

Electrical-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Jan-29-2007 Update

Abnormal-Loading-Huge-Chunk-of-Ice-Falling-from-Sky
Jan-28-2007 Update

Rehabilitating-Existing-Building-2-in-Highland-Park-Michigan
Jan-27-2007 Update

Rehabilitating-Existing-Building-in-Highland-Park-Michigan
Jan-26-2007 Update

Face Lift-2 For Harrison Plaza in Livonia Michigan
Jan-24-2007 Update

New-Accessories-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Jan-23-2007 Update

Interior-Framing-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Jan-22-2007 Update

Footing-for-New-Face-Brick-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Jan-20-2007 Update

Renovation-of-Ramez-Rasho-and-Senan-Sesi-Party-Store-on-Wick-Road-in-Taylor-Michigan
Jan-19-2007 Update

Accessory-Item-Installation-on-ICF-Walls_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
Jan-17-2007 Update

Way of the Energy Efficient Building Champions
An interview series ...
Added Jan-15-2007

Face-Brick-and-Stone-Installation_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
Jan-14-2007 Update

Open-Web-Steel-Joist-Installation_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
Jan-13-2007 Update

Boulder-Retaining-Wall-at-North-End-of-Driveway_for-Stehr-House-in-Highland-Twp-Michigan
Jan-11-2007 Update

Rough-Framing-Inspection_for-Dan-Hossack-ICF-House-in-Independence-Twp-Michigan
Jan-10-2007 Update

New-ICF-House-in-Independence-Twp-Michigan
Jan-09-2007 Update

Pool-Addition_in-Bloomfield-Twp-Michigan
Jan-05-2007 Update

Dan-Hossack-ICF-House-with-the-elevated-deck
Jan-02-2007 Update

Latest project Update added in Dec 2006

Elevated-Deck_for-Dan-Hossack-ICF-House-5024-Rockaway-Lane-in-Independence-Twp-Michigan
Dec-30-2006 Update

Electrical for Stehr House in Highland Twp Michigan
Dec-29-2006 Update

New ICF House by Merit Builders
Dec-28-2006 Update

Basement-Sump-Line-Drainage_for-Project-in-Wayne-Michigan
Posted on Dec-27-2006

Grading-for-Surface-Runoff_for-Project-in-Wayne-Michigan
Posted on Dec-26-2006

Grading-and-Seeding-Sodding-Alley_for-Project-in-Wayne-Michigan
Posted on Dec-23-2006

New ICF House by Merit Builders
Dec-22-2006 Update

Installation of Doors and Windows-3 for Stehr House in Highland Twp Michigan
Dec-21-2006 Update

Framing of Interior Stud Walls-4 for Stehr House in Highland Twp Michigan
Dec-20-2006 Update

Septic Field-3 for Stehr House in Highland Twp Michigan
Dec-20-2006 Update

Septic Field-2 for Stehr House in Highland Twp Michigan
Dec-19-2006 Update

Septic Field for Stehr House in Highland Twp Michigan
Dec-18-2006 Update

Framing of Interior Stud Walls-3 for Stehr House in Highland Twp Michigan
Dec-18-2006 Update

Electrical Meter and Panel Installation-3 for Stehr House in Highland Twp Michigan
Dec-18-2006 Update

Framing of Interior Stud Walls-2 for Stehr House in Highland Twp Michigan
Dec-17-2006 Update

Polyurethane Spray Insulation-2 for Stehr House in Highland Twp Michigan
Dec-16-2006 Update

Framing of Interior Stud Walls for Stehr House in Highland Twp Michigan
Dec-15-2006 Update

Rehabilitation-of-commercial-building-in-Wayne-Michigan
Dec-14-2006 Update

Polyurethane Spray Insulation for Stehr House in Highland Twp Michigan
Dec-13-2006 Update

First Floor Slab Concrete Placement-2 for Stehr House in Highland Twp Michigan
Dec-12-2006 Update

Electrical Meter and Panel Installation-2 for Stehr House in Highland Twp Michigan
Dec-11-2006 Update

Certification-per-HUDs-PFGMH_for-house-in-Wales-Michigan
Dec-10-2006 Update

Addition_to-Party-Store-in-Detroit-Michigan
Dec-09-2006 Update

Installation of Doors and Windows-2 for Stehr House in Highland Twp Michigan
Dec-08-2006 Update

Roof Shingles-4 for Stehr House in Highland Twp Michigan
Dec-08-2006 Update

Installation of Doors and Windows for Stehr House in Highland Twp Michigan
Dec-07-2006 Update

Water Well Hookup and Tank Installation for Stehr House in Highland Twp Michigan
Dec-07-2006 Update

Backfill Against Basement Walls-3 for Stehr House in Highland Twp Michigan
Dec-07-2006 Update

Electrical Meter and Panel Installation for Stehr House in Highland Twp Michigan
Dec-07-2006 Update

Backfill Against Basement Walls-2 for Stehr House in Highland Twp Michigan
Dec-06-2006 Update

Roof Shingles-3 for Stehr House in Highland Twp Michigan
Dec-06-2006 Update

First Floor Slab Concrete Placement for Stehr House in Highland Twp Michigan
Dec-05-2006 Update

Backfill Against Basement Walls for Stehr House in Highland Twp Michigan
Dec-04-2006 Update

Roof Shingles-2 for Stehr House in Highland Twp Michigan
Dec-04-2006 Update

Steel Framing in Porch Area-2 for Stehr House in Highland Twp Michigan
Dec-04-2006 Update

Face Lift-2 for Atoms Juice Bar at 15104 Kercheval Street in Grosse Pointe Park Michigan
Dec-03-2006 Update

Face Lift for Atoms Juice Bar at 15104 Kercheval Street in Grosse Pointe Park Michigan
Dec-02-2006 Update

Truss-Framing-Fix-2_for-new-house-project-in-Saline-Michigan
Dec-01-2006 Update

Latest project Update added in Oct-Nov 2006

Truss-Framing-Fix_for-new-house-project-in-Saline-Michigan
Nov-30-2006 Update

Steel Framing in Porch Area for Stehr House in Highland Twp Michigan
Nov-29-2006 Update

Roof Shingles for Stehr House in Highland Twp Michigan
Nov-29-2006 Update

Erecting Roof Trusses-8 for Stehr House in Highland Twp Michigan
Nov-28-2006 Update

Erecting Roof Trusses-7 for Stehr House in Highland Twp Michigan
Nov-27-2006 Update

Erecting Roof Trusses-6 for Stehr House in Highland Twp Michigan
Nov-24-2006 Update

Erecting Roof Trusses-5 for Stehr House in Highland Twp Michigan
Nov-22-2006 Update

Stairs from Basement to First Floor for Stehr House in Highland Twp Michigan
Nov-22-2006 Update

Post Footings in Porch Area for Stehr House in Highland Twp Michigan
Nov-21-2006 Update

Erecting Roof Trusses-4 for Stehr House in Highland Twp Michigan
Nov-21-2006 Update

Erecting Roof Trusses-3 for Stehr House in Highland Twp Michigan
Nov-20-2006 Update

Face Lift for Harrison Plaza in Livonia Michigan
Nov-18-2006 Update

Bonus Room Roof Trusses for Building in Ecorse Michigan
Nov-17-2006 Update

Erecting Roof Trusses-2 for Stehr House in Highland Twp Michigan
Nov-14-2006 Update

Erecting Roof Trusses for Stehr House in Highland Twp Michigan
Nov-13-2006 Update

light-gage-metal-framing_for-ICF-House-in-Ira-Township-Michigan
Nov-11-2006 Update

Roof Trusses Delivered for Stehr House in Highland Twp Michigan
Nov-10-2006 Update

Wall Plates for Roof Trusses for Stehr House in Highland Twp Michigan
Nov-10-2006 Update

Water Well Capped-Off for Stehr House in Highland Twp Michigan
Nov-10-2006 Update

First Floor ICF Walls Concrete Placement for Stehr House in Highland Twp Michigan
Nov-06-2006 Update

First Floor ICF Walls-02 for Stehr House in Highland Twp Michigan
Nov-03-2006 Update

First Floor ICF Walls for Stehr House in Highland Twp Michigan
Oct-30 to Nov-02 2006 Update

Water Well Drilling for Stehr House in Highland Twp Michigan
Oct-26-2006 Update

Electrical Transformer Installation for Stehr House in Highland Twp Michigan
Oct-26-2006 Update

Waterproofing Basement ICF Walls for Stehr House in Highland Twp Michigan
Oct-24-2006 Update

First Floor Steel Open Web Joists and Metal Deck - 03 for Stehr House in Highland Twp Michigan
Oct-23-2006 Update

First Floor Steel Open Web Joists and Metal Deck - 02 for Stehr House in Highland Twp Michigan
Oct-19-2006 Update

First Floor Steel Open Web Joists and Metal Deck for Stehr House in Highland Twp Michigan
Oct-13-2006 Update

First Floor Steel Open Web Joists for Stehr House in Highland Twp Michigan
Oct-12-2006 Update

Basement ICF Walls-concrete-placement for Stehr House in Highland Twp Michigan
Oct-06-2006 Update

Basement ICF Walls-03 for Stehr House in Highland Twp Michigan
Oct-05-2006 Update

Basement ICF Walls-02 for Stehr House in Highland Twp Michigan
Oct-03-2006 Update

Basement ICF Walls for Stehr House in Highland Twp Michigan
Oct-02-2006 Update

Latest project Update added in Sep-2006

renovating-existing-building-for-Paul-Mitchell-School-in-Sterling-Heights-Michigan
Sep-29-2006 Update

third-floor-concrete-placement_for-Building-in-Ecorse-Michigan
Sep-29-2006 Update

Basement Slab Concrete Placement for Stehr House in Highland Twp Michigan
Sep-29-2006 Update

Radiant Heat Tubing in Basement Slab for Stehr House in Highland Twp Michigan
Sep-27-2006 Update

Basement Plumbing for Stehr House in Highland Twp Michigan
Sep-19-2006 Update

Insulation Under Basement Slab for Stehr House in Highland Twp Michigan
Sep-18-2006 Update

DrainTile on Inside for Stehr House in Highland Twp Michigan
Sep-13-2006 Update

Monolithic Slab Layout for Stehr House in Highland Twp Michigan
Sep-11-2006 Update

Trench Footing Inspection for Stehr House in Highland Twp Michigan
Sep-08-2006 Update

Trench Footings for Stehr House in Highland Twp Michigan
Sep-07-2006 Update

Basement Prep for Stehr House in Highland Twp Michigan
Sep-05-2006 Update

Latest project Update added on Sep-01-2006

Construction Road for Stehr House in Highland Twp Michigan
Sep-01-2006 Update

Latest project Update added on Aug-31-2006

Foundation Excavation for Stehr House in Highland Twp Michigan
Aug-31-2006 Update

Latest project Update added on Aug-30-2006

New IcF House Project for Gary and Pam Stehr
in Highland Township Michigan Aug-30-2006 Update

Latest Happening added on Aug-23-2006

Energy Efficient Building -- Thailand Projects Group
formed

Latest project Update added on Aug-21-2006

Aircraft Hanger Building-01
in St Clair Michigan
Aug-21-2006 Update

Latest project Update added on Aug-12-2006

New ICf House for Gary and Pam Stehr
in Highland Township Michigan
Aug-12-2006 Update

Latest project Update added on Jul-19-2006

Block Wall Reinforcement With Carbon-Fiber/Kevlar-Grid
House Renovation in Milford Michigan
Jul-19-2006 Update

Latest project Update added week of Jul-02-2006

Renovation of Banquet Hall in Warren Michigan
Jul-04-2006 Update

Renovation of Commercial Building in Wayne Michigan
Jul-03-2006 Update

Latest project Update added week of Jun-25-2006

ICF Home Project With Tall Basement Walls in Milford Michigan
Jun-30-2006 Update

Design For ICF Home Project With Tall Basement Walls in Milford Michigan Jul-01-2006 Update

Design For ICF Home Project With Tall Basement Walls Jul-01-2006 Update

ICF-home-project-tall-basement-walls Jun-30-2006 Update

new-home-project-basement-walls May-27-2006 Update

new-home-project-basement May-20-2006 Update

new-home-project-foundation May-06-2006 Update

ICF House KouJ1yae-101 Apr-29-2006 Update

ICF House KLE_1yae-101 Apr-29-2006 Update

ICF House EneE1-104 Apr-24-2006 Update

ICF House MerB1yae-101 Apr-20-2006 Update

ICF House EneE1-104 Apr-14-2006 Update

ICF House RedW1yae-148 Apr-12-2006 Update

House Addition ARC_1-101 Apr-12-2006 Update

ICF House MerB1-101 Apr-10-2006 Update

Aircraft Hangar Building in St Clair Michigan

Fire Damaged House in Ypsilant Michigan

Car Hit Damaged Building in Ypsilanti Michigan

ReBuild / Renovate Damaged Areas from Car Hit
Project Start ... Jan-2006

Bar Building in Sumpter Twp Michigan

Addition / Renovation of Facility
Project Start ... Dec-2005

House With Leaning Porch in Wayne Michigan

Permanent Foundation for Porch Supports
Project Start ... Aug-2004

Multiunit Facility Bacony ... Wayne Michigan

Structural Integrity Restoration
Project Start ... Jul-2004



beginning of recent-projects-list

back to our recent-projects

back to our more-recent-projects

back to our Energy Efficient Building Network home page

Fill in the following form to subscribe to our upcoming news letter, to keep
up with our latest updates, and to tell us how we can help:

Please note that all fields followed by an asterisk must be filled in.
Name
E-mail Address*
question or comment




Partner With Us

If you are involved with energy efficient building projects as:
  • Designer
  • Architect
  • Engineer
  • Contractor
  • Specialty contractor
  • Surveyor
  • Developer
  • Supplier
  • Financier
  • ....
we invite you to tell us about yourself by filling in the special contact form
I have setup for your convenience. Let us see if we can create synergy
by utilizing our combined resources and create a win-win situation!






Yours Sincerely


Yogi Anand, D.Eng, P.E.

Energy Efficient Building Network LLC
308 Longford Dr -- Rochester Hills MI 48309 U.S.A.
Phone: +1-248-375-5710; Cell: +1-248-766-1546
Google